Project History & Milestones
Our journey with the Blora Block began with a rigorous technical foundation and a commitment to long-term energy production.
Joint Study Phase
Conducted an intensive joint study with Migas from October 2008 to January 2009
Tender Award
Successfully granted the "Direct Offer Tender" on July 30, 2009
PSC Signing
The Production Sharing Contract (PSC) was officially signed on November 30, 2009, with BPMIGAS
Asset Profile The Blora Block
The Blora Block is a high-potential asset located in the Central-East Java region. Situated within the renowned East Java Basin, this onshore gas field offers a proven petroleum system and a strategic location adjacent to existing, productive oil and gas fields.
Proven Discovery
The block features the Rembang Field, a confirmed gas discovery that underscores the area's high commercial value.
Strategic Operations
The block is currently operated by TIS Petroleum E&P Blora Pte. Ltd., ensuring efficient production workflows.
Key Project Statistics
Working Area
Blora Block Onshore Gas Field
Status
Production Phase
Location
Central Java Province
Current Retained Area
1,002.67 sq.km (20% of initial area)
Geological Setting
East Java Basin (Proven Petroleum System)
Why Energy Block?
Active Production
Currently operational, ensuring immediate contribution to the energy supply chain.
Proven Reserves
Home to the Rembang Field, featuring confirmed gas discoveries and a robust petroleum system.
Strategic Location
Situated in the East Java Basin with direct access to established infrastructure for efficient distribution.
Proven Synergy
A solid partnership between TIS, BEB, and SRE that guarantees operational excellence.
